The following column is the Road Watch report for Glades County for the week beginning Sunday, Sept. 27,..
Join our family of readers for as little as $10 per month and support local, unbiased journalism.
Already have an account? Log in to continue. Otherwise, follow the link below to join.
Please log in to continue |
GLADES COUNTY — The following column is the Road Watch report for Glades County for the week beginning Sunday, Sept. 27, provided by the Florida Department of Transportation.
U.S. 27 from South of the Caloosahatchee River Bridge to Old U.S. 27 Road: (Routine maintenance) Crews will perform nighttime milling and resurfacing operations on northbound and southbound U.S. 27 from south of the Caloosahatchee River Bridge to Old U.S. 27 Road in Moore Haven to repair deteriorated asphalt.
Current schedule: Milling and resurfacing activities are scheduled to be completed by October 18, 2026
S.R. 78 Westbound near 7425 S.R. 78 in Ortona: (Maintenance project) Florida Department of Transportation (FDOT) field crews will perform shoulder repairs on westbound S.R. 78 near 7425 S.R. 78 in Moore Haven.
Drivers should follow all posted traffic-control signs and be prepared for changing traffic conditions in the area.
U.S. 27 (SR 25), Railroad Crossing East of Palmdale Sand Mine and Northwest of Moore Haven: Motorists should expect increased train activity beginning in October for the 2026 harvest season. FDOT and South-Central Florida Express remind drivers to allow extra travel time, remain alert and obey all railroad crossing signs, signals and gates. Never drive around lowered gates or enter the crossing unless there is enough room for the entire vehicle to clear the tracks. Wait until gates are fully raised, warning lights stop flashing and tracks are clear before proceeding.
As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.