Okeechobee County Road Watch Report for week beginning May 17

Posted 5/15/26

The following column is the Road Watch report for Okeechobee County for the week beginning Sunday, May 17.

You must be a member to read this story.

Join our family of readers for as little as $10 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

Okeechobee County Road Watch Report for week beginning May 17

Posted

OKEECHOBEE COUNTY — The following column is the Road Watch report for Okeechobee County for the week beginning Sunday, May 10, provided by the Florida Department of Transportation.

Districtwide Movable Bridges (Okeechobee County): Construction Project: The Florida Department of Transportation is installing Intelligent Transportation Systems (ITS) at the US 41/US 98 (SR 700) Taylor Creek Bridge in Okeechobee County. Construction began on Sunday, June 22, 2026. This project includes the installation of pedestrian/bicycle detection systems, conduits and electrical components, and connection to bridge tender buildings.

  • Testing will begin in early February 2026.
  • Motorists are advised that there will be intermittent sidewalk and lane closures throughout the duration of construction.
  • Motorists should expect lane closures during the nighttime/overnight hours from 7 p.m. to 6 a.m.
  • Motorists are advised to use caution in the construction zone.
  • Variable message signs will be in place to alert drivers that work is underway. Estimated completion of testing is in May 2026, weather permitting.

S.R. 15/U.S. 441 at SE 28th Street: Construction project: Crews are performing curb ramp replacements and installing sidewalk, curb, and gutter improvements at the intersection of S.R. 15/U.S. 441 and SE 28th Street.

  • Intermittent lane closures will occur as needed from 8:30 a.m. to 5 p.m. throughout construction activities.
  • Motorists should be aware of changing traffic patterns, heavy equipment, and workers present in the construction zone. Use caution when traveling through the area and obey posted signage and flagging operations.
  • Estimated project completion is summer 2026. 

S.R. 710 from North of SE 48th Street to Martin County Line: Construction project: Crews will begin milling and resurfacing operations along the project limits.

  • Work will take place throughout the corridor and may include lane closures and traffic shifts as construction progresses.
  • Intermittent nighttime flagging operations will occur from 6 p.m. to 6 a.m., Sunday through Friday.
  • Daytime shoulder closures will occur from 7 a.m. to 5 p.m., Monday through Friday.
  • Motorists should expect possible delays and changing traffic patterns. Drivers are urged to use caution, follow posted signage, and watch for workers and equipment in the construction zone.

As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.

road work, road watch, construction, traffic, delays
x