Glades County Road Watch Report for week beginning Nov. 22-28

Posted 11/20/26

U.S. 27 (S.R. 25), Railroad Crossing East of Palmdale Sand Mine and Northwest of Moore Haven: Motorists should expect increased train activity ...

You must be a member to read this story.

Join our family of readers for as little as $10 per month and support local, unbiased journalism.


Already have an account? Log in to continue. Otherwise, follow the link below to join.

Please log in to continue

Log in
I am anchor

Glades County Road Watch Report for week beginning Nov. 22-28

Posted

GLADES COUNTY — The following column is the Road Watch report for Glades County for the week beginning Sunday, Nov. 22 provided by the Florida Department of Transportation.                                                                                                  

U.S. 27 (S.R. 25), Railroad Crossing East of Palmdale Sand Mine and Northwest of Moore Haven: Motorists should expect increased train activity beginning in October for the 2026 harvest season. FDOT and South-Central Florida Express remind drivers to allow extra travel time, remain alert and obey all railroad crossing signs, signals and gates. Never drive around lowered gates or enter the crossing unless there is enough room for the entire vehicle to clear the tracks. Wait until gates are fully raised, warning lights stop flashing and tracks are clear before proceeding.

U.S. 27 (S.R. 25) from South of Wayman Road to North of Fisheating Creek: Construction project: FDOT will resurface approximately 10.5 miles of U.S. 27 to improve the roadway surface and support safer, more reliable travel. Project improvements include milling and resurfacing, drainage and guardrail improvements, and new pavement markings and signage.

  • Construction is scheduled to begin in late 2026.
  • Daytime and nighttime lane closures may occur throughout the project limits.
  • Traffic may be reduced to one lane at times, and temporary road closures may occur during construction.
  • Motorists should use caution, expect changing traffic patterns, and watch for workers and heavy equipment throughout the construction zone.

Estimated completion: 2028

As a reminder, travelers can visit www.FL511.com or dial “511” from their phone to learn about traffic conditions on major roadways across the state.

road watch, US 27, railroad crossing
x